Should we Build Mega Transport Project in Cities? The Case of TransPeshawar Pakistan
Abstract
The research indicates that TransPeshawar Project faces a huge gap for its successful completion and implementation due to many reasons which approve the recommendations of BRT studies conducted worldwide. Its aim is to find out the present status and challenges of mega transport projects carried out in four cities of Pakistan. Total budget, numbers of riders and operating cost were analyzed for each project. It is interesting that all of the three completed projects are not earning enough money to support their own operations. They are still getting a huge amount from the government in order to operate smoothly. In a country like Pakistan, neither had they obtained their objectives nor support the government financially but benefit a specific sect one way or the other way. The situation will be even worse for BRT Peshawar. Therefore it is recommended that the government should prefer roads, highways or motorways instead of such mega projects in cities. The research is focused on a single case study of BRT projects of Pakistan, its findings may apply to such projects in other cities in similar economic and political contexts.
Keywords
Full Text:
PDFReferences
Addendum-1 to Tender Document for Purchase of Bus Fleet 2017. Retrieved from
http//transpeshawar.pk
Ahmed Jamal Pirzada (2011). "Draft: Role of Connectivity in Growth Strategy of Pakistan".
Planning Commission, Pakistan.
Aamir Yasin, 2016. Underutilized buses: operational cost too high to run empty buses routs.
Retrieved from https://www.dawn.com/news/1231348.
Altshuler, Alan; Luberoff, David (30 April 2003). Mega Projects: The Changing Politics of
Urban Public Investment. Brookings Institution Press. ISBN 978-0-8157-0129-3.
Brookes, Naomi J.; Locatelli, Giorgio (2015-10-01). “Power Plants as mega Projects:
"Using empirics to shape policy, planning, and construction management". Utilities Policy. 36: 57–66.
Expression of Interest (2016). Development, Implementation, Operations and Maintenance of
Automated Fare Collection and Bus Scheduling System (AFC-BSS) for Public Transport Service in Khyber Pakhtunkhwa". Government of KPK. Retrieved from https://www.kpk.gov.pk.
Report (2016). Global BRT Data. Retrieved from. http://brtdata.org/.
Dawn news (Oct.3, 2016). Heavy loans of subsidies October 3rd, 2016: CDA to share annual loses of Rwp-Isb metro buses with Punjab. Retrieved from www.dawnnews.com.
Times of Islamabad (21 March 2017). Metro bus project running in huge losses of billions
CDA unable to shoulder burden of Metro Bus in long term with Punjab. Retrieved from http//timesofislamabad.com
Projects (2016). Lahore BRT. Retrieved from https://thinktransportation.net/project/
Lahore BRT System Study". Lahore Transport Company. Retrieved 7 August2013.
http://www.ltc.gop.pk.
Lahore News HD, 2017. Failure of Speedo bus service: Lahore news. Retrieved from
https://www.youtube.com/
Metro Bus Multan (2016). Metro Bus Multan Complete and Final Route Map. Retrieved from
http://www.pakimag.com.
Lahore Metro (2015). Metro Bus Lahore Pakistan -Rapid Bus Transport. Retrieved on 2018-
-09 from http//pakvisit.com.
Dawn News (24-1-2018). Multan Metrobus "PM inaugurates Multan Metrobus". Retrieved from
www.dawn.com
News TV (27-3-2018). Poor route plan of Multan metro bus. Retrieved from
https://www.newstv.pk.
th Population and Housing Census 2018. Pakistan Bureau of Statistics- Retrieved from www.pbscensus.gov.pk.
Ministry of Finance (2014-15) "Pakistan Economic Survey. Retrieved on 4 April 2017 from
www.finance.gov.pk.
"Peshawar Sustainable Bus Rapid Transit Corridor Project" (February 2017). Asian
Development Bank. Retrieved on 22 March 2017 from www.adb.org.
Map (2015). Peshawar BRT Bus Rapid Transit. Retrieved from
https://www.politicpk.com/brt-map
Pojani, Dorina. 2014. “Bus Rapid Transit, Design and Engineering of.” In M. Garrett (ed.) Encyclopedia of Transportation: Social Science and Policy, pp 322-325. Thousand Oaks, Ca: Sage.
"Provisional Summary Results Of 6th Population And Housing Census-2017". Retrieved from
www.pbs.gov.pk.
Pravakar Sahoo (March 2011). "Macroeconomic Performance and Infrastructure Development
in India". Transport Infrastructure in India: Developments, Challenges and Lessons from Japan (PDF) (Research Paper). Institute of Development Economies, Japan External Trade Organization. p. 4. 465.
Report, Bureau (19 March 2017). "Peshawar metro bus project costlier than Lahore, Pindi's".
Retrieved on 2018-06-09 from www.Dawn.com
Shahram Haq, 2017. Feeder buses to start operations to help Multan Metro project. Retrieved
From https://tribune.com.pk.
"Tender-2017, Document for Purchase of Bus Fleet". TransPeshawar. Retrieved on 11
January 2018 from http//transpeshawar.pk.
Sohail Khattak, 2018. Peshawar BRT bill balloons by 40 per. Retrieved from
https://tribune.com.pk.
Transport for London. London Underground: History. ISBN 978-0-904711-30-1. Retrieved 2013-
-02.
The World Bank (2011). "Transportation in Pakistan". World Bank.
Wirasinghe, S. C., Lina Kattan , M. M. Rahman , J. Hubbell , R. Thilakaratne, and Sabreena Anowar. 2013. “Bus Rapid Transit: A Review.” International Journal of Urban Sciences 17(1):1-31.
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 International Journal of Experiential Learning & Case Studies
This work is licensed under a Creative Commons Attribution 4.0 International License.
Comments on this article
by Kevin Jones (2019-07-01)
by Hoang Vuong (2019-07-31)
by Una Maya (2019-08-20)
by Betty Hewett (2019-09-09)
by Betty Hewett (2019-09-09)
by Mrs tarmy trinh (2019-09-18)
by Phest Ryuta (2019-09-21)
by Loot Ters Xers (2019-09-26)
by Aisha Tiona (2019-09-30)
by Aisha Tiona (2019-09-30)
by Betty Hewett (2019-10-02)
by Betty Hewett (2019-10-02)
by Betty Hewett (2019-10-02)
by Betty Hewett (2019-10-02)
by kentangsakti kentang pasti sakti (2019-10-12)
by Kênh tổng hợp News (2019-10-13)
by IDN Poker (2019-11-02)
by helly janes (2019-12-02)
by sewa villa puncak cipanas (2019-12-05)